Rapid Tent - Eco Structures

3,205+ Structures Delivered · 265+ Projects · 20+ Countries

Australian Owned & Designed
3,205+

Delivered

20+

Countries

265+

Projects

Rapid Tent

Deploy Luxury Accommodation in Hours — No Council Approvals Required.

A$9,000 AUD (Excl. GST, Shipping calculated at checkout)
3.6m x 2.7m
9.2m² Area
4.5m x 2.7m
12.2m² Area
5.4m x 2.7m
14.6m² Area
1.8m x 2.7m
4.9m² Area
1
Subtotal
A$9,000
Current Lead Time: 90-120 Days
Simple and safe payment.
Your configuaration is done

Talk to an expert

Current configuration

Your current configuration will be attached to your message for our reference.

Rapid Tent

Rapid Tent

Fill in your contact information

Error: Contact form not found.

Rapid Tent gallery

Non-Permanent Glamping

What's Included
  • PVC Roof Fly
  • Canvas Walls and Ceilings (Rot & Water Proof)
  • 75mm (3inches) Insulated Panel Floor System
  • Floor Finish Varnish Ply Floor
  • Black Rope
  • Star Pickets
  • Painted Structural Steel
  • 300mm (11inches) High Adjustable Footing System
  • All Fixings Required
  • Optional Front Composite Decking Boards

Available in three standard footprints:

  • 3.6m x 2.7m
  • 4.5m x 2.7m
  • 5.4m x 2.7m

Shipping Efficiency:

  • 24 Rapid Tents fit in 1 40ft High Cube Container.
  • Shipping calculated at checkout.

Designed for rapid deployment:

  • 1 Day Install time per unit
  • Requires a level site
  • Features 300mm ground clearance with 100mm adjustable leveling capability
  • Minimal tools required

Frequently Asked Questions

Do I need approvals?

Rapid Tents are classed as temporary structures, often bypassing lengthy approvals. However, we always recommend checking with your local council.

What is the Warranty?

Painted Structural Steel 5 Years Limited Warranty

Canvas & PVC 4 Year Limited Warranty

Not designed for installation beyond 5 months.

Retensioning is required every 4 weeks.

Failure to meet these requirements will void the warranty.

Can I move it?

Yes, they are fully relocatable assets. If demand shifts or land use changes, you can pack down and move the entire structure.

What is the lead time?

Currently 90-120 days for manufacturing plus approximately 4 weeks for shipping.

Let's Discuss Your Project

Step 1: Project Vision

Let's Discuss Your Project

Step 2: Project Stage

Let's Discuss Your Project

Step 3: Contact Details